Summary
A walk-through of the new Yunfu factory: steel structure and roof up, deep floor prep before pouring, three bays larger than the old plant, office and slab display planned for the far bay — then three storefront signage options for comment. Move-in targeted by year-end.
Chapters
Click to seek in the on-page player (after YouTube ID is set).
Full transcript
Guys, our new factory is finally up.
Let me show you.
The steel structure is already standing.
The roof is on too.
Let's step inside.
Right now this floor looks really flat.
It's not flat at all.
We dug deep. See here? The ground used to be this high. All dug out.
Next step is pouring the floor.
Over here, the concrete mixers are all ready to go.
In about ten days, floor's done.
Office goes in this area.
And this area where we're standing now—
These two bays will show slab processing,
in the far right bay.
Three bays in total here.
Much bigger than our old factory.
Let me show our signage.
Look, a few storefront designs.
Here's one.
And this is another one.
And here's a third.
Which one do you think looks better, more impressive? Tell me in the comments.
We move in by year-end.
By then I'll show you our brand-new factory.